SECTION 4 – INSTALLATION
4-1. Installing Welding Generator
Movement
YDo Not Lift Unit From End
Airflow Clearance
18in
(460 mm)
Location
18 in
18 in
(460 mm)
OR
(460 mm)
18 in | 18 in | |
(460 mm) | ||
(460 mm) | ||
|
OR
Grounding | 1 | 3 | Y Always ground | generator | |||
4 | |||||||
| GND/PE |
|
| frame to vehicle frame to pre- | |||
|
|
|
| vent electric shock and static | |||
|
|
|
| electricity hazards. | |||
| OR |
| 1 | Generator Base |
| ||
|
|
| 2 | Metal Vehicle Frame | |||
|
|
| 3 | Equipment Grounding | |||
|
|
|
| Terminal |
|
| |
| Electrically bond generator frame to |
| 4 | Grounding Cable |
| ||
| vehicle frame by |
| Use #10 AWG or larger insulated | ||||
2 | contact. | 2 | |||||
copper wire. |
|
| |||||
|
|
| Y If unit does not have GFCI re- | ||||
|
|
|
| ceptacles, | use | GFCI- | |
|
|
|
| protected extension cord. |
install1 12/99 – Ref.
4-2. Connecting The Battery
YConnect Negative
Cable Last.
–
+
Tools Needed:
1/2 in