5-3. Torch And Work Cable Connections

8

9

2

5

11

613

7

10

3

1

4

12

Tools Needed:

5/8 in

If torch or work cable needs to be removed or replaced, proceed as follows:

Turn power Off, and disconnect in- put power plug from receptacle. Re- move top and screws holding front panel in place. Without disconnect- ing any plugs, move front panel to allow access.

Torch Connections

1Strain Relief Clamp

2Torch Cable

Insert cable through strain relief clamp.

3Gas Connector

4Gas Valve

Install gas connector onto gas valve.

5Plug PLG18

6Safety Control Board PC2

7Receptacle RC18

Connect PLG18 to RC18. Route leads along existing lead bundle.

8Female Friction Terminals

9Male Friction Terminal

10Power Control Board PC1

11Receptacle RC4

Connect female terminals to leads 23 and 24 from RC4 (connect to either lead). Connect male terminal to lead 25 from RC4. Route leads as shown.

Work Cable Connections

12 Strain Relief Clamp

Insert work clamp lead through strain relief clamp.

13 Receptacle RC6

Connect work clamp lead to lead 20 from RC6 (leads not shown). Route leads along existing lead bundle.

801 423-A / Ref. 801 300-B

OM-2210 Page 21

Page 25
Image 25
Hobart Welding Products OM-2210 manual Torch And Work Cable Connections, Torch Connections