Hobart Welding Products OM-498 manual Installation, Installing Welding Generator

Models: OM-498

1 60
Download 60 pages 14.62 Kb
Page 17
Image 17

SECTION 4 – INSTALLATION

4-1. Installing Welding Generator

Movement

Airflow Clearance

 

 

 

18 in

 

 

(460 mm)

 

18 in

18 in

 

(460 mm)

 

(460 mm)

 

 

 

18 in

18 in

 

(460 mm)

 

(460 mm)

 

 

 

Location

 

 

OR

 

 

 

install1 1/97 – 802 512-A / Ref. 151 556 / 158 936-A / S-0854

4-2. Grounding Generator To Truck Or Trailer Frame

Y Always ground generator frame to vehicle frame to pre- vent electric shock and static

 

 

electricity hazards.

 

1

Generator Base

 

2

Metal Vehicle Frame

 

3

Equipment Grounding

1

3

Terminal

 

4

Grounding Cable

 

GND/PE

4

 

Use #10 AWG or larger insulated

 

copper wire.

OR

Y If unit does not have GFCI

 

 

receptacles, use GFCI-

 

 

protected extension cord.

Electrically bond generator frame to vehicle frame by metal-to-metal contact.

2

2

install1 1/97* – Ref. 151 556 / S-0854

OM-498 Page 13

Page 17
Image 17
Hobart Welding Products OM-498 Installation, Installing Welding Generator, Grounding Generator To Truck Or Trailer Frame