A SS E M B LY

I N S T R U C T I O N S

Step 2c

F R A M E A S S E M B L Y

In this step start by pressing four 1” O.D. x 3/4” I.D. Flanged Oilites into the Foot Rest Leg Assembly. Next insert the 1” Dia. x 4 7/16” Shaft into the lower part of the Foot Rest Leg Assembly. Make sure the 1/8” hole on the Shaft is in line with the 3/16” hole on the Foot Rest Assembly. Then insert any small metal pin to hold the shaft with 1/8” hole to align for bolting. Then remove the small metal pin when finished. Place Rubber Grip (cut to fit) on both ends of the 1”Dia x 4 7/16”. Next attach the Foot Rest Leg Assembly to the Running Base Assembly as shown. Insert the 8 29/32” Long Shaft onto the upper part of the Foot Rest Leg Assembly. Make sure the 1/8” hole on the Shaft is in line with the 3/16” hole. Then insert any small metal pin into the shaft for alignment. Remove the small metal pin when finish bolting. Attach the Foot Rest Assembly to the Foot Rest Leg Assembly as shown. For the final step, slide the Rubber grip onto the 12 31/32” Long Shaft and slide two Aluminum Rings onto both side of the shaft. Attach the 12 31/32” Long Shaft to the Foot Rest Assembly. Then Wrench tighten bolts including all previously hand tightened bolts.

Part Descriptions

Hardware Descriptions

21

- Shaft (12 31/32” LG.)

G - 1/2”-13 x 1” Flat Head Cap Screw (White Zinc)

 

22

- Rubber Grip (12 9/32 LG.)

CB - Insert

 

23

- Aluminum Ring

CC - Bumper Stopper

 

24

- Foot Rest Assembly

CF - 1” I.D. Flanged Oilite

 

25

- Foot Rest Leg Assembly

 

26

- Shaft (8 29/32” LG.)

 

27

- Rubber Grip (36” LG.)

 

56

- Shaft (4 7/16” LG.)

 

Page 9

HOIST

FITNESS SYSTEMS

R

2403 Assembly

Page 10
Image 10
Hoist Fitness CL-2403 owner manual Rubber Grip 36 LG