A SS E M B LY

I N S T R U C T I O N S

Step 2b

F R A M E A S S E M B L Y

In this step, you will attach (30) and (7) to (8). Mount (CB) to (1) and (8) before attaching (9) and (8) to the bottom of (1). Next attach (5), (11), (44), (CH), and (10) to (1). Hand Tighten bolts only, they will be tightened later.

Part Descriptions

Hardware Descriptions

1

- Seat Assembly

D - 3/8”-16 x 1/2” Flat Head Cap Screw (White Zinc)

5

- Shaft (1/2 Dia. x 1.240 LG.)

E - 3/8”-16 x 3/4” Flat Head Cap Screw (White Zinc)

7

- 2”x 4” End Cap (HH)

S - 5/16”-18 x 1 1/4” Button Head Screw (White Zinc)

8

- Back Adjuster Assembly

U - 5/16”-18 x 4 1/2” Hex Head Screw (White Zinc)

9

- Shaft (3/4”Dia. x 4 27/32 LG.)

AE - 3/8” Flat Washer (White Zinc)

10

- Back Adjuster Assembly

AM - 5/16” Flat Washer (White Zinc)

11

- Pull Pin (Long)

BD - 5/16” Lock Nut (White Zinc)

30

- Adjustable Plate

CB - Gas Spring

44

- Pull Pin to Chain Link Connector

CH - Master Chain Link

Page 7

HOIST

FITNESS SYSTEMS

R

2407 Assembly

Page 8
Image 8
Hoist Fitness CL-2407 owner manual 2x 4 End Cap HH