A SS E M B LY

I N S T R U C T I O N S

Step 2b

F R A M E A S S E M B L Y

In this step start by attaching (CM) to (5) and make sure to put zerk fitting facing down, then attach (9) to (5). Next, slide (16) through one (CM) then through (9) and through another (CM). Then secure (16) and

(9)with (CN). After (9) is secure to (5) attach (K) to both ends of (16). Hand Tighten bolts only, they will be tightened later.

Part Descriptions

Hardware Descriptions

5

- Weight Cage Assy.

B - 3/8-16 x 1 1/4” Button Head Screw

9

- Pivoting Foot Plate Assy.

K - 3/8-16 x 1” Flat Head Cap Screw

15

- Aluminum Cap

AC - 3/8” Internal Lock Washer

16

- Shaft

AH - 3/8” Flat Washer

 

 

AJ - 3/8” Flat Washer

BA - 3/8” Lock Nut

CC - Plug Bumper

CM - Flange Bearing

CN - 3/8” x 2” Spiral Roll Pin

Page 7

HOIST

FITNESS SYSTEMS

R

2412 Assembly

Page 8
Image 8
Hoist Fitness CL-2412 owner manual Pivoting Foot Plate Assy