![](/images/backgrounds/229673/bg7.png)
BEFORE
YOU BEGIN ASSEMBLY
7
INTRODUCTION
IMPORTANT
PRECAUTIONS
ELLIPTICAL
OPERATION
CONDITIONING
GUIDELINES
TROUBLESHOOTING
& MAINTENANCE
LIMITED
WARRANTY
GUIDE RAILS
BOLT (B)
MAIN FRAME
FRONT STABILIZER TUBE
BOLT (A)
A) Open HARDWARE BAG FOR STEP 1.
B) Extend the GUIDE RAILS away from the MAIN FRAME until bolt holes line up.
C) Secure GUIDE RAILS using 2 BOLTS (B).
D) Attach the FRONT STABILIZER TUBE to the MAIN FRAME using 2 BOLTS (A).
BOLT (A)
20 mm
Qty: 2
BOLT (B)
15 mm
Qty: 2
HARDWARE BAG FOR STEP 1 CONTENTS :