ASSEMBLY STEP 3

HARDWARE BAG 3 CONTENTS :

BOLT (B)

SPRING WASHER (C)

FLAT WASHER (D)

20 mm

15 mm

15 mm

Qty: 4

Qty: 4

Qty: 4

 

LEAD WIRE

RUNNING

 

DECK

 

CONSOLE CABLE

RIGHT CONSOLE MAST

 

BOLTS (B)

 

SPRING WASHERS (C)

BASE FRAME

FLAT WASHERS (D)

AOpen hardware bag 3.

BPull lead wire through right console mast. After pulling the lead wire through the mast, the top of the console cable should be located at the top of the mast. Detach and discard the lead wire.

CWith the running deck in the raised position, attach the right console mast to the base frame using 4 bolts

(b), 4 spring washers (c) and 4 flat washers (d).

Note: Be careful not to pinch any wires while assembling the right console mast.

8

Page 8
Image 8
Horizon Fitness T101 owner manual Hardware BAG 3 Contents