Hoshizaki AM-50BAE manual AM-50 AM-100 &AM-150

Models: AM-50BAE

1 31
Download 31 pages 60.32 Kb
Page 16
Image 16
(AM-50)

(AM-50)

(AM-100 &AM-150)

AM-50:Position and lock the ice chute on to the front and rear frame pipes by pushing the chute down until it clicks

AM-100 & AM-150:Place the rear of the water tank on the water tank rest at the back of the storage bin. Use the thumbscrews to secure the front of the water tank to the mechanism base.

AM-50:Slide in the water tank along the rails at the bottom of the right and left brackets until it clicks into place

- 16 -

Page 16
Image 16
Hoshizaki AM-50BAE manual AM-50 AM-100 &AM-150