Manuals
/
Hoshizaki
/
Kitchen Appliance
/
Ice Maker
Hoshizaki
F-801MAH/-C, F-801MWH/-C service manual Low water except water-cooled model
Models:
F-801MWH/-C
F-801MAH/-C
1
20
58
58
Download
58 pages
1.83 Kb
17
18
19
20
21
22
23
24
<
>
Specifications
Wiring Diagrams
Maintenance
Problem Possible Cause Remedy
Cleaning Procedure
Adjustment of Flake Size
Cleaning Solution
Refrigerant Recovery
Sanitizing Solution
Page 20
Image 20
[e] Low water (except
water-cooled
model).
20
Page 19
Page 21
Page 20
Image 20
Page 19
Page 21
Contents
Modular Flaker
Hoshizaki AMERICA, INC
Contents
Page
Specification Icemaker
801MAH
801MWH
Potable Water WATER-COOLED Condenser
801MAH-C
801MWH-C
II. General Information Construction
801MAH/-C
801MWH/-C
Control Box Layout
Relay Gear
801MAH/-C
801MWH/-C
Wiring Diagrams
801MAH/-C, F-801MWH/-C
Sequence of Electrical Circuit
Page
Compressor starts about 60 sec. after gear motor starts
Page
Low water except water-cooled model
Page
Page
When flush timer operates for 15 min. every 12 hours
Page
Page
Timing Chart
90 sec
150 sec Sec
Performance Data
ICE Production
Pressure Drop of Cooling Water Line
1110 1112 1124
1083 1082 1081
Bottom View CW Higher CCW Lower
Adjustment of Flake Size
Service Diagnosis No Ice Production
Problem Possible Cause Remedy
Bussman GMD
Problem Possible Cause Remedy
Low Ice Production
Other
LIME-A-WAY
VI. Removal and Replacement of Components
Service for Refrigerant Lines
Refrigerant Recovery
Evacuation and Recharge R-404A
Brazing
Removal and Replacement of Compressor
Removal and Replacement of Drier
Removal and Replacement of Expansion Valve
Page
Removal and Replacement of Evaporator Assembly
Cutter
Extruding Head
Auger
Bearing-Lower and Mechanical Seal
Gear Motor
Page
Page
Removal and Replacement of Fan Motor
Removal and Replacement of Control Water Valve
Removal and Replacement of Flush Water Valve
VII. Cleaning and Maintenance
Preparing the Icemaker for Long Storage
Cleaning and Sanitizing Instructions
Cleaning Solution
Cleaning Procedure
Sanitizing Solution
Sanitizing Procedure Initial
Sanitizing Procedure Final
Page
Maintenance