14)Evacuate the system, and charge it with refrigerant. For the
15)Connect the terminals to the compressor, and replace the terminal cover in its correct position.
16)Replace the panels in their correct position, and turn on the power supply.
4. Removal and Replacement of Drier
IMPORTANT
Always install a new drier every time the sealed refrigeration system is opened. Do not replace the drier until after all other repairs or replacement have been made.
1)Turn off the power supply, and remove the panels.
2)Recover the refrigerant and store it in an approved container, if required by an applicable law.
3)Remove the drier using brazing equipment.
4)Install the new drier with the arrow on the drier in the direction of the refrigerant flow. Use nitrogen gas at the pressure of 3 - 4 PSIG when brazing the tubings.
5)Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.
6)Evacuate the system, and charge it with refrigerant. For the
7)Replace the panels in their correct position, and turn on the power supply.
42