To remove badly oxidized grease that refuses to come off:

a)Support the rotor in a vertical position and immerse the bearing in hot kerosene or a mixture of alcohol and light mineral solvent.

b)Gently spin the bearing outer ring.

c)Dry and reflush the bearing with clean light oil.

d)It is important not to under or over grease the bearings as this will lead to over heating and premature failure. It is recommended that the bearings be filled with grease using a suitable spatula. In addition the housings should be no more than half filled.

6.2.4 Mechanical seals

No adjustment is possible. When leakage reaches an unacceptable level the seal will need replacement.

6.2.5 Gland packing

The stuffing box gland can be backed off for re-packing or to enable the addition of extra rings of packing.

The stuffing box is normally supplied with a lantern ring to enable a clean or pressurised flush to the centre of the packing. If not required, this can be replaced by an extra 2 rings of packing.

There must always be a small leakage, normally a minimum of 120 drops per minute to atmosphere to lubricate and cool the packing is required.

6.3 Spare parts

6.3.1 Ordering of spares

Flowserve keeps records of all pumps that have been supplied. When ordering spares the following information should be quoted.

1)Pump serial number.

2)Pump size.

3)Part name – taken from section 8.

4)Part number – taken from section 8.

5)Number of parts required.

The pump size and serial number are shown on the pump nameplate.

To ensure continued satisfactory operation, replacement parts to the original design specification should be obtained from Flowserve. Any change to the original design specification (modification or use of a non-standard part) will invalidate the pump’s safety certification.

6.3.2 Storage of spares

Spares should be stored in a clean dry area away from vibration. Inspection and re-treatment of metallic surfaces (if necessary) with preservative is recommended at 6 monthly intervals.

6.4Recommended spares and consumable items

For start up purposes:

1 - complete set of gland packing

2 - shaft sleeves

1 - set of gaskets and seals (optional: 2 - mechanical seals)

For 2 years operation:

1 - set of bearings (line and thrust)

2 - sets of gland packing

2 - shaft sleeves

2 - sets of gaskets and seals

2 - lantern rings

2 - casing wear rings

1 – diaphragm bush

(optional: 2 - mechanical seals 2 - impeller wear rings)

For 4 years operation:

1 - set of bearings (line and thrust)

2 - sets of gland packing

2 - shaft sleeves

2 - sets of gaskets and seals

2 - lantern rings

2 - casing wear rings

Page 22 of 32