UB USER INSTRUCTIONS ENGLISH 71569247 07-04

®

INDEX

 

 

PAGE

Additional sources (10.3).........................................

31

Alignment of shafting (4.2, 4.4 and 4.6)

 

Assembly (6.10).......................................................

24

ATEX marking (1.6.4.2) .............................................

7

CE marking and approvals (1.2)................................

4

Certification (9) ........................................................

31

Change notes (10.2) ................................................

31

Clearances (6.7, Renewal clearances)....................

23

Commissioning and operation (5)............................

16

Compliance, ATEX (1.6.4.1)......................................

6

Configurations (3.1) .................................................

11

Consumable items (6.4) ..........................................

22

Copyright (1.4) ...........................................................

4

Design of major parts (3.3) ......................................

11

Direction of rotation (5.3) .........................................

17

Disassembly (6.8) ....................................................

23

Disclaimer (1.3)..........................................................

4

Dismantling (6.8, Disassembly) ...............................

23

Drawings (8) ............................................................

29

Duty conditions (1.5)..................................................

4

Electrical connections (4.7) .....................................

16

End of product life (2.5) ...........................................

10

Examination of parts (6.9)........................................

24

Fastener torques (6.6) .............................................

23

Faults; causes and remedies (7) .............................

27

Forces and moments (4.5.3) ...................................

15

Foundation (4.2) ......................................................

12

General arrangement drawing (8.2) ........................

30

General assembly drawings (8)...............................

29

Grouting (4.3)...........................................................

12

Guarding (5.4)..........................................................

17

Handling (2.2) ..........................................................

10

Hydraulic, mechanical and electrical duty (5.9).......

19

Inspection (6.2.1 and 6.2.2).....................................

21

Installation (4) ..........................................................

12

Lifting (2.3)...............................................................

10

Location (4.1)...........................................................

12

Lubrication (5.2 and 6.2.3)

 

Lubrication schedule (5.2.2) ....................................

17

Maintenance (6).......................................................

20

Maintenance schedule (6.2) ....................................

20

Name nomenclature (3.2)........................................

11

Nameplate (1.7.1) ......................................................

8

Operating limits (3.4.1) ............................................

11

Options (8.1.2) .........................................................

30

Ordering spare parts (6.3.1) ....................................

22

Parts lists (8)............................................................

29

Performance (3.4)....................................................

11

Piping (4.5) ..............................................................

13

 

PAGE

Pre-commissioning (5.1) ..........................................

16

Priming and auxiliary supplies (5.5) .........................

17

Protection systems (4.8) ..........................................

16

Reassembly (6.10, Assembly) .................................

24

Receipt and unpacking (2.1) ....................................

10

Recommended grease lubricants (5.2.1) .................

17

Recommended spares (6.4).....................................

22

Recycling (2.5) .........................................................

10

Renewal clearances (6.7).........................................

23

Replacement parts (6.3 and 6.4)..............................

22

Running the pump (5.7)............................................

18

Safety action (1.6.3) ...................................................

5

Safety markings (1.6.1) ..............................................

5

Safety, protection systems (1.6 and 4.8)

 

Sectional drawings (8)..............................................

29

Sound pressure level (1.9, Noise level) .....................

9

Sources, additional information (10.3) .....................

31

Spare parts (6.3) ......................................................

22

Specific machine performance (1.8) ..........................

8

Starting the pump (5.6).............................................

18

Stop/start frequency (5.7.6)......................................

19

Stopping and shutdown (5.8) ...................................

19

Storage, pump (2.4) .................................................

10

Storage, spare parts (6.3.2) .....................................

22

Supplementary manuals or information sources

......31

Supplementary User Instructions (10.1)...................

31

Tools required (6.5) ..................................................

23

Torques for fasteners (6.6).......................................

23

Trouble-shooting (see 7) ..........................................

27

Vibration (5.7.5)........................................................

19

Warning labels (1.7.2) ................................................

8

Page 3 of 32