2.If you are not using an RPS, plug the included power cord into the Remote 2C’s power cord receptacle and into an AC power source as shown below.

Power receptacle on the back of the Remote 2C

3.After power has been applied to the Remote 2C, it executes a self test. Check the LEDs during self test. Self test lasts up to 3 seconds for the Remote 2C and then each module executes its own self test simultaneously. The self test time for each module varies depending on which modules are installed. The Internet Router Module requires approximately 60 seconds. If both modules are installed, self test time is still approximately 60 seconds because the modules self- test simultaneously:

During Self Test:

All LEDs are ON for the Remote 2C. Then some of the Remote 2C’s LEDs turn off while the modules are tested.

After Self Test:

LEDs For:

LEDs that are ON

 

 

Front of Remote 2C

Power

 

RPS (if connected)

 

In Use for Slot A and/or Slot B

 

10Base-T or 100VG

 

 

Internet Router Module

Power

 

Sys Ok

 

LAN 10Base-T

 

100VG

 

Link OK

 

 

Internet Router Module

LAN Activity

Slide-In Label

 

 

 

10