Site requirements
About this document
This document outlines the installation requirements for a 12 m (40 ft) HP POD. These guidelines are for a qualified architectural or consulting engineering team to generate
Site preparation
The HP POD must be installed on a surface capable of supporting approximately 50,456 kg (111,000 lb). The site location for the HP POD must be level +/- 0.5 degrees tolerance. Appropriate clearance for installation, service, and system utilities (power and water) must also be considered.
IMPORTANT: Before installing the HP POD, consult your local AHJ for applicable codes and to review
IMPORTANT: The HP POD is designed for ground level installation. If you install the HP POD on an elevated surface, make sure the minimum height requirements for circuit breaker actuators are considered per local and national electric code requirements.
The area in front of the outside panels must include a work platform. The distance from the work platform surface to the center of any circuit breaker actuator handle must not exceed 183 cm (72 inches). The platform must be a minimum of 91 cm (36 inches) wide for free air, and if the platform construction is grounded metal, must be a minimum of 107 cm (42 inches) wide.
Safety information
The HP POD is certified to UL 69050/IEC 60950 as an Information Technology Product and Classified according to the National Electric Code
The HP POD is not suitable for long term human occupancy. The HP POD has service access areas for periodic maintenance and service. These areas must be used only by
IMPORTANT: Before installing the HP POD, consult your local AHJ for applicable codes and to review
Before installing your HP POD, verify that the following prerequisites have been met:
•All components have been delivered to your facility.
•The HP POD, power distribution components, and water distribution components are in their final location.
•You have facility power at your final location.