•You have chilled water at your final location.
•You have made provisions for properly grounding the HP POD.
System utilities
Your site location must accommodate the following utilities:
•Cooling water
•Electrical power ("Power" on page 5)
•Drainage (on page 6)
Power
Item | Description |
|
|
1 | Main input power junction box |
|
|
2 | Chilled water return connection |
|
|
3 | Chilled water supply connection |
|
|
4 | IT cable portals |
|
|
Site requirements 5