STARTING CPU INSTRUCTION TESTS - SECTIONS 35/86

SECTION 035

.

.

.

SECTION 086

STARTING CPU EXTENDED TESTS - SECTIONS 87/100

SECTION 087

.

.

.

SECTION 100

STARTING FLOATING POINT TESTS - SECTIONS 102/134

SECTION 102

.

.

.

SECTION 134

<<<MASTER = 1 SLAVE = 0>>>

STARTING MULTIPLE PROCESSOR TESTS - SECTIONS 140/149

SECTION 140

Set up for LDW/STW (line test) test

Testing the LDW/STW instructions (line test) - syncronously

Checking ownership of blocks, and LDW/STW times

Set up for LDW/STW (word test) test

Testing the LDW/STW instructions (word test) -- syncronously

Checking ownership of blocks, and LDW/STW times

SECTION 141

Functional test of PDTLB instruction

SECTION 142

Functional test of PITLB instruction

SECTION 143

PDTLB head on interface test

SECTION 144

PITLB head on interface test

SECTION 145

LOAD/STORE instructions test (virtual mode)

Set up for virtual mode LDW/STW test

Testing the LDW/STW instructions

Testing the LDWM/STWM instructions

Testing the LDWX/STW instructions

Testing the LDH/STH instructions

Running ODE Tools on HP 9000 Systems 31