HTC Rev. A05 Board Level 2.5 Repairs, „ Basic Repair Instructions for Component Replacement

Models: Rev. A05

1 109
Download 109 pages 22.97 Kb
Page 103
Image 103

HTC Corporation

.

Doc. Title

Diamond Service Manual

Doc. No.

DOC-00040624 REV.

Issued Date

2008/4/14

 

A05

Revised Date

2008/6/23

Page

103 of 109

9.2 Board Level 2.5 Repairs

„Basic Repair Instructions for Component Replacement:

Step 1 Place the solder-proof tape to cover the surrounding area of the components which being replaced.

WarningDO NOT overheat the tape and components to avoid the tape melted and the components damaged

Step 2 Use Heater Gun (HAKO850B, set the temperature between 350°C, Air Speed 3~5) to remove the components.

Step 3 Wait till the temperature cool down before removing the solder-proof tape to avoid other components being removed

Step 4 After the damaged or defective components have been replaced; clear the surroundings for solder and flux residues.

Notice:

A.Checking the polarity of CON8, and the position can't be shifted.

B.Checking the polarity of SW8SW7, and it can't be reversed.

C.All the parts of the PCB should be checked if it is missing or not.

D.The OP must to wear antistatic wrist band .Don't put boards together and avoid hitting them.

E.When you solder and repair that the soldering iron, temperature must be setup 415. (The temperature range is 415±5), and the solder wire's diameter is 0.4/0.5/0.6mm (SAC 305 (1.1%)

F.Please be noticed to follow below steps for main board repair which is equipped with Golden Capacitor:

1. When replacing level 2.5 components located around the golden capacitor:

I.The temperature of the hot air blower must be under 400°c

II.When apply the hot air to the part / component, the heating time must be under 20

seconds (including the time of removing and soldering)

III.The temperature of the soldering iron must be under 350°c

IV. When apply the solder tip to the part / component, the heating time must be under 5 seconds

V. The solder tip must not contact with the golden capacitor

2.For BGA replacement: The golden capacitor must be removed before perform pre-heating, heating, soldering and de-soldering process, and then it must be replaced with a new one (please refer to 1.c. and 1.d. steps)

3.For main board which failed to pass the function test, the golden capacitor must be replaced with a new one and must follow below soldering criteria: The temperature of the soldering iron must be under 350°c When apply the solder tip to the part / component, the heating time must be under 5 seconds The solder tip must not have a contact with the body of golden capacitor

HTC CONFIDENTIAL

SM-TP001-0704

Page 103
Image 103
HTC Rev. A05 service manual Board Level 2.5 Repairs, „ Basic Repair Instructions for Component Replacement