Hubbell Electric Heater Company HSE, HE manual Annual Inspection

Models: HSE HE

1 22
Download 22 pages 19.05 Kb
Page 12
Image 12

4.Inspect ceiling supports for tightness and/or damage.

5.Check for loose electrical connections. Tighten as necessary.

ANNUAL INSPECTION

1.Flush tank as follows

a.Shut off power supply.

b.Close valve on hot water outlet piping.

c.Open valve on drain piping.

d.Cold water inlet line pressure will be strong enough to flush sediment from the bottom of the tank out through the drain. Let water run for 3-4 minutes.

e.Close drain valve.

f.Open hot water valve.

g.Turn power supply ON.

12

Page 12
Image 12
Hubbell Electric Heater Company HSE, HE manual Annual Inspection