Hubbell Electric Heater Company SLN Section V - Servicing & Replacement Of Parts, Relief Valve

Models: SLN

1 22
Download 22 pages 60.58 Kb
Page 15
Image 15
SECTION V - SERVICING & REPLACEMENT OF PARTS

SECTION V - SERVICING & REPLACEMENT OF PARTS

WARNING / CAUTION

Before servicing or replacing any part make sure to turn the power supply switch to the OFF position.

RELIEF VALVE

1.Disconnect power from unit.

2.Shut off incoming cold and solar water supply.

3.Lift test lever on relief valve to relieve pressure in tank.

4.Disconnect overflow piping.

5.Unscrew relief valve, remove assembly and replace with new one.

6.Connect overflow piping.

7.Turn on incoming water supply and check for leaks.

8.Turn safety switch to ON position.

Test LeverRELIEF VALVE

Overflow Piping Outlet

Tank Connection

Temperature ProbeManual background

15

Page 15
Image 15
Hubbell Electric Heater Company SLN manual Section V - Servicing & Replacement Of Parts, Relief Valve, Warning / Caution