Hubbell Electric Heater Company SLN manual Piping Installation

Models: SLN

1 22
Download 22 pages 60.58 Kb
Page 9
Image 9
PIPING INSTALLATION

PIPING INSTALLATION

NOTE: The most effective means for preventing deterioration from accelerated corrosion due to galvanic and stray current is the installation of dielectric fittings/unions. The installation of these fittings is the responsibility of the installing contractor.

1.All integral components have been properly sized to meet design conditions. Piping to the unit should be sized to meet the design conditions, as dictated by good engineering practices.

2.Connect solar water supply and return lines to heating coil assembly.

3.Connect the cold water inlet and hot water outlet to the appropriate connections as shown; refer to the drawing for location and sizes.

4.Install the combination temperature and pressure safety relief valve in the tapping provided. Note that this is required by law for safety considerations.

9

Page 9
Image 9
Hubbell Electric Heater Company SLN manual Piping Installation