New Construction – suspended between joists

B11

F

E

Slide the mounting rails into brackets.

B12

5/8

5/8

1/2

1/2

 

Position the correct depth mark at the bottom edge of the joist based on the thickness of your sheetrock.

B13

B14

F

1/8” bit

Mark position of screws by using holes as a template.

Drill a hole in the center of each outline.

B15

Insert screws, leaving space between the screw head and the joist. Screws are not provided.

8

05-HF-008-Eng_3.13.06.indd 8

B16

Attach the rails onto the screws.

41952-01 3/13/2006

3/13/06 12:08:45 PM

Page 8
Image 8
Hunter,R.F 83005 manual B11, B12, B13, B15, New Construction suspended between joists