Pop out the first wiring access slug. Use second if needed.

Insert the strain relief (not included) into the housing and

 

secure with washer.

Choose Installation Option

For New Construction - attaching to joist go to step A11, page 5

For New Construction - suspended between joists go to step B11, page 8 For Existing Construction - accessible from above go to step C11, page 11 For Existing Construction - accessible only from below go to step D11, page 15

New Construction - attaching to joist

A11

 

 

F

5/8

5/8

1/2

1/2

 

Position the correct depth mark at the bottom edge of the

joist based on the thickness of your sheetrock.

41952-01 3/13/2006

05-HF-008-Eng_3.13.06.indd 5

A12

Screw pre-loaded screws into joist or framing.