New Construction – suspended between joists
B11 |
E |
D |
Slide the mounting rails into brackets.
B12
5/8 | 5/8 | |
1/2 | ||
1/2 | ||
|
Position the correct depth mark at the bottom edge of the joist based on the thickness of your sheetrock.
B13 | B14 |
E | 1/8” Bit |
|
Mark position of screws by using holes as a template. | Drill a hole in the center of each outline. |
B15
Insert screws, leaving space between the screw head and the joist. Screws are not provided.
8
41718_EngS_3.29.06.indd 8
B16 |