FLOOR KIT INSTRUCTIONS | Parts Needed: | ||
A | 2 | - | |
FOR 8X8 BUILDINGS | C | 5 | - |
| |||
ACTUAL SIZE 96” WIDE x | D | 2 | - 2x4x72" Bond Boards |
F | 2 | - 2x4x24" Bond Boards | |
|
|
| - 2" and 3" Nails |
|
|
|
|
NOTE: Part letters are Not stamped on floor kits. ASSEMBLY OF 8’ x
IMPORTANT!
If you will be storing heavy items (such as lawn tractor, motorcycle, snowmobile etc.) we recommend you upgrade from 24” on center (61 cm) to 12” on center (30.5cm) floor framing. This requires you to add the following material:
• Qty. (4) of 2”x 4”x | • 16 ea. 3” (7.6cm) galvanized nails |
DF
A
CCC
F |
| D |
|
24" | 24" | 24" | 24" |
(61 cm) | (61 cm) Center of | (61 cm) | Center of (61 cm) |
| Stud |
| Stud |
| 96" |
|
|
| (244 cm) |
|
|
C
F
DC
D
(4) 3" Nails
at Joint
(2) 3" Nails
A:Position Floor Joists C
Using 3” nails, nail twice through
each Bond Board | D & F into each |
end of each Joist | C , keeping pieces |
flush at top and ends, and maintain 24” spacing. Where D & F join together use
B
Y
X
B:Completed Floor Frame should be positioned at building site, leveled,
using shims between floor frame and ground before proceeding to Floor Panel Attachment.
Square frame by making
X
Y