8X8 OPTIONAL SHELF INSTRUCTIONS
Parts needed to cut:
B1 - 23-7/8x92-5/8x5/8" Floor Panel
C1 - 2x4x89-1/2" Floor Joist
E2 - 2x4x48" Bond Boards
-2" and 3" Nails
Cut
Cut
A
CB
(1) -
Cut
(1) -
E
(2)- 48" Board E cut down to 2 pieces of
SHELF PARTS TO CUT:
A:Cut the
B
3" Nails
| ||
|
| |
| 88" |
|
| 32" | 3" Nails |
| Center | |
28" |
| |
Center | of Stud | |
|
|
of Stud
SHELF ASSEMBLY:
| Rear Wall |
C | 3" Nails |
| 3" Nails |
| 3" Nails |
| 3" Nails |
2" Nails
B:Mark the 88” Board as shown at 28” then another 32”. Attach the
SHELF INSTALLATION:
C:Install the shelf frame resting on the horizonal Back Wall Brace. Attach middle braces with 3” nails as shown. Level front of frame and nail into Side Wall Studs or Top Plate depending on your building model with 3” nails as shown.
Rear Wall
2" Nails
D
SHELF PANEL INSTALLATION:
D:Center the
4