ASSEMBLY
UNPACK CARTON & iNSTALL HANDLE See Fig. 2)
CAUTION: Be careful of exposed staples when handling or disposing of carton= ing material.
IMPORTANT:WHEN UNPACKINGANDASSEMBLING TILLER, BE CAREFUL NOT TO STRETCH OR KINK CABLE(S).
Cut cable ties securing handle column.
Route cable(s) as shown and slide handle column onto handle mount.
•Remove all packing from carton.
•Secure handle column using two (2) carriage bolts and two (2) flange Iocknuts. Tighten securely.
•Cut away carton.
•Route tine control cable(s) through plastic cable clip on handle mount.
NOTE: Cables must not touch the muffler.
Cut cable ties securing tiller to skid. Remove tiller from skid by pulling backwards.
Remove screws securing depth stake to skid and dis- card the screws.
TINE
MOUNT
TINE HANDLE
CONTROL
CABLES
COLUMN
CARRIAGE
BO_
FLANGE
LOCKNUT
Fig. 2
iNSTALL DEPTH STAKE ASSEMBLY
(See Fig. 3)
Loosen nut '_'.
•Insert stake support between engine bracket halves with stake spring down.
•Bolt stake support to engine brackets with bolts, lock washers and nuts. Tighten securely. Tighten nut '_'.
•Depth stake must move freely. If it does not, loosen support bolt.
ENGINE BRACKET
HALVES
NUT "A"
DEPTH STAKE
SUPPORT
STAKE
SPRING
DEPTH
STAKE
SUPPORT
BOLT
HEX BOLTS,
LOCK WASHERS,
AND HEX NUTS
Fig. 3
HANDLE HEIGHT
Handle height may be adjusted to better suit operator. (See "HANDLE HEIGHT" in the Service and Adjust- ments section of this manual).
TILLING WIDTH
•Tilling width may be adjusted to better handle your tilling conditions (See "TINE ARRANGEMENT" in the Service and Adjustments section of this manual).
TiN E OPERATION
Check tire operation before first use. (See "TINE OP- ERATION CHECK" in the Service and Adjustments section of this manual).
5