ASSEMBLY
With the exception of handlebars, controls and transport kit, your new tiller has been completely assembled at the factory. It should be noted that right and left sides are determined by the operators position behind the unit.
ITEM ORDER |
| |
NO. | NO. | DESCRIPTION |
1 | 505 29 | Grip, Handlebar |
2505 29
3505 29
4 | 505 29 | Isolator |
5 | 505 29 | Nut, Throttle/Switch Assy |
6 | 505 29 | Throttle Cable |
7 | 505 29 | Wire Assembly |
8505 29
9505 29
10505 29
11505 29
12505 29
13505 29
16 | 505 29 |
17505 29
18505 29
23 | 505 29 | Tie Strap |
24 | 505 29 | Throttle Trigger |
25 | 505 29 | Housing, Wire Assy & Thrl Cable |
HANDLEBARS (LOWER) (See Fig. 1) | Fig. 1 |
|
1.Place a curved washer onto each of two (2) 1/4” x 4 1/2” hex head bolts.
2.Place lower handlebar (left hand) into position below engine and insert both hex head bolts with curved washers, through handlebar and transmission housing.
3.Place lower handlebar (right hand) into position over exposed ends of hex head bolts.
4.Install two (2) curved washers over bolts and follow with tow (2) 1/4” indented loc nuts.
5.Snug loc nuts to hold handlebars in
HANDLEBARS (UPPER) (See Fig. 1)
1.Place upper handle between lower handles. Install two (2) curved head carriage bolts to hold upper handle in place.
2.Secure carriage bolts with two (2) curved washers and plastic tee knobs.
3.Next, firmly tighten lower loc nuts against handlebars until all handlebar “play” has been eliminated.
1.Mount drag stake onto bracket with clevis pin and hairpin cotter pin. See Fig. 20 on page 16 for assembly sequence.
5