2

1

4

1.

Front bagger tube

3

2.

Lower bagger tube

 

3.

1/4 x 50,8mm Carriage

 

 

Bolts

 

4.

1/4 Lock nut

 

 

 

5

 

 

3

 

2

 

 

 

6

1.

Front bagger tube

7

2.

1/4 x 50,8mm Carriage

 

 

Bolts

 

3.

1/4 Lock nut

1

4.

Vinyl Binding

 

5.

Dump handle tube

4

6.

Clevis pin

7.

Retainer spring

6MM (1/4") - 9MM (3/8")

 

 

1

2

3

1. Top Surfaces Even

2.Horizontal Adjustment Bracket

3.Vertical Adjustment Bracket

1

2

 

 

A

 

3

 

1.

Handle

 

2.

Retainer Spring

A

 

 

3.

Pin

 

4.

Plug

 

4

Eng To Assemble Bagger

NOTE: For ease of assembly, you may wish to obtain the assistance of another person when putting the bagger to- gether.

Assemble front and lower bagger tubes using four (4) 1/ 4 x 50,8mm carriage bolts and lock nuts supplied. Tighten securely.

Slide front and lower bagger tube assembly into the bagger assemby.

Assemble front and upper bagger tubes using four (4) 1/ 4 x 50,8mm carraige bolts and lock nuts supplied. Tighten securely.

Slip all the vinyl bindings over the bagger tubes

Slide the bagger dump handle through the hole in the bagger top, install the clevis pin and secure with retainer spring.

NOTE: For future use, the clevis pin may be removed in order to use the handle to clear the chute in the event it has become clogged.

Bagger adjustment

For proper bag function and appearance, it may be neces- sary to adjust the bagger assembly. There should be 6mm (1/ 4")-9mm (3/8") gap between the bagger top and fender and the bagger top surface should be even with the top surface of the fender. To adjust bagger position:

Horizontal adjustment

Slightly loosen the nuts securing the bagger RH and LH horizontal adjustment brackets. Loosen only enough so the brackets keep their position, but allow them to be moved.

Move the brackets the amount forward or backward you wish the bag assembly to move. Retighten the nuts securely.

Vertical adjustment

Slightly loosen the nuts securing the vertical adjustment brackets. Loosen only enough so the brackets keep their position, but allow them to be moved.

Move the brackets the amount up or down you wish the bag assembly to move. Retighten the nuts securely.

Reinstall the bagger assembly and check the bagger to fender fit. If necessary, repeat the procedure until proper fit is attained.

To convert to bagging, mulching or discharge See "Section 5" of this manual.

To assemble and install mulcher plug

Remove spring retainer and pin from handle.

Insert plug into handle. Make sure that the letter "A" on both the plug and handle are on the same side and that they can both be seen from the top when laying on the ground.

Secure with pin and retainer spring provided. For instal- lation see "To Convert Mower" in Section 5 of this manual.

24

Page 24
Image 24
Husqvarna CTH135 instruction manual Eng To Assemble Bagger, Bagger adjustment, Horizontal adjustment, Vertical adjustment