ASSEMBLY
•Slide front and lower bagger tube assembly into the bagger assemby.
•Assemble front and upper bagger tubes using four (4) 1/4 x 50,8mm carraige bolts and lock nuts supplied. Tighten securely.
•Slip all the vinyl bindings over the bagger tubes
•Slide the bagger dump handle through the hole in the bagger top, install the clevis pin and secure with retainer spring.
•Push cap over end of bagger dump handle.
NOTE: For future use, the clevis pin may be removed in order to use the handle to clear the chute in the event it has become clogged.
6MM (1/4") - 9MM (3/8") |
TOP SURFACES |
EVEN |
HORIZONTAL |
ADJUSTMENT |
BRACKET |
VERTICAL |
ADJUSTMENT |
BRACKET |
02329 |
DUMP HANDLE TUBE
RETAINER |
|
SPRING |
|
1/4 X 2" |
|
CARRIAGE | CLEVIS |
BOLTS | PIN |
| CAP |
1/4 LOCK NUT |
|
FRONT BAGGER TUBE |
|
02593
VINYL
BINDING
FIG. 7
TO ASSEMBLE AND INSTALL MULCHER PLUG (See Fig. 8)
•Remove spring retainer and pin from handle.
•Insert plug into handle. Make sure that the letter "A" on both the plug and handle are on the same side and that they can both be seen from the top when laying on the ground.
•Secure with pin and retainer spring provided. For in- stallation see "To Convert Mower" in Section 5 of this manual.
FIG. 6
BAGGER ADJUSTMENT (See Fig. 7)
For proper bag function and appearance, it may be nec- essary to adjust the bagger assembly.There should be 6mm
HORIZONTAL ADJUSTMENT
•Slightly loosen the nuts securing the bagger RH and LH horizontal adjustment brackets.Loosen only enough so the brackets keep their position, but allow them to be moved.
•Move the brackets the amount forward or backward you wish the bag assembly to move. Retighten the nuts securely.
VERTICAL ADJUSTMENT
•Slightly loosen the nuts securing the vertical adjust- ment brackets. Loosen only enough so the brackets keep their position, but allow them to be moved.
•Move the brackets the amount up or down you wish the bag assembly to move. Retighten the nuts securely.
•Reinstall the bagger assembly and check the bagger to fender fi t. If necessary, repeat the procedure until proper fit is attained.
HANDLE
RETAINER
SPRING
PIN | A |
|
A
PLUG
0221 4
FIG. 8
9