ASSEMBLY / PRE-OPERATION
INSTALLDISCHARGECHUTE/CHUTEROTATORHEAD (See Fig. 4 and 5)
NOTE: The
1.Place discharge chute assembly on top of chute base with discharge opening toward front of snow thrower.
2.Position chute rotator head over chute bracket. If neces- sary, rotate chute assembly to align square and pin on un- derside of chute rotator head with holes in chute bracket.
3.With chute rotator head and chute bracket aligned, position chute rotator head on pin and threaded stud of mounting bracket.
4.Install locknut and cable guide on threaded stud and tighten securely.
CHUTE | LOCKNUT |
| |
CABLE GUIDE | |||
ROTATOR | |||
|
| ||
HEAD |
|
| |
|
| PIN | |
|
| THREADED | |
|
| STUD | |
| ROTATOR HEAD | ||
CHUTE | ALIGN BEFORE | MOUNTING | |
BRACKET | TIGHTENING LOCKNUT | BRACKET |
FIG. 4
5.Place rotator cables through cable guide and secure cables to the lower handle using the double clip.
ROTATOR |
|
CABLES | CABLE GUIDE |
| |
DOUBLE |
|
CLIP |
|
ROTATOR |
|
CABLES |
|
FIG. 5 |
|
INSTALL CHUTE DEFLECTOR REMOTE CONTROL (See Figs. 6 and 7)
1.Install remote cable bracket to discharge chute with
2.Install remote cable eyelet to chute deflector with
3.Install spring hooks between hex nuts on chute rotator head and into hole in chute deflector as shown.
SPRING | CHUTE |
DEFLECTOR | |
SHOULDER |
|
BOLT | HOOK |
| BETWEEN |
| HEX NUTS |
| ON CHUTE |
ROTATOR | |
LOCKNUT | HEAD |
| |
| CARRIAGE |
| BOLT |
CABLE |
|
EYELET |
|
REMOTE |
|
CABLE |
|
BRACKET |
|
| |
LOCKNUT |
|
FIG. 6
4.Install all 3 control lever knobs by pressing them down onto the control levers.
KNOB | KNOB |
| CONTROL LEVER |
FIG. 7
CHECK TIRE PRESSURE
The tires on your snow thrower were overinflated at the fac- tory for shipping purposes. Correct and equal tire pressure is important for best snow throwing performance.
•Reduce tire pressure to
6