Icom IC-M88 instruction manual Optional BP-226 battery case

Models: IC-M88

1 40
Download 40 pages 48.96 Kb
Page 30
Image 30

9 BATTERY CHARGING

Optional BP-226 battery case

When using the optional battery case attached to the trans- ceiver, install 5 AA (R6) size alkaline batteries as illustrated at right. The IC-M88 meets JIS waterproof specification grade

7.However, the BP-226 meets JIS waterproof specification grade 4.

qHook your finger under the latch, and open the cover in the

direction of the arrow (q). (Fig.1)

wThen, install 5 AA (R6) size alkaline batteries. (Fig.2)

Install the alkaline batteries only.

Be sure to observe the correct polarity.

Do not pin the ribbon under the batteries.

eClose the cover with fitting in the direction of the arrow (w) first, then firm the latch in place (e). (Fig.1)

Be sure to the gasket and the ribbon are set correctly, and do not protrude out of the battery case. (Fig.3)

CAUTION:

When installing batteries, make sure they are all the same brand, type and capacity. Also, do not mix new and old batteries together.

Keep battery contacts clean. It’s a good idea to clean battery terminals once a week.

Fig.1

BP-226

Latch

q

w e

Fig.2

Ribbon

Fig.3

Gasket

Ribbon

24

Page 30
Image 30
Icom IC-M88 instruction manual Optional BP-226 battery case