STEP 11 (See Diagram 11 & Lower Cable Loop Diagram)

A.) Attach the 157” Lower Cable (#46) to the lower opening on the Leg Developer (#8). Attach a Pulley (#67) to the opening. Secure it with one M10 x 2 5/8” Allen Bolt (#92), two Ø 7/8” x 5/8” Pulley Bushings (#56), and one M10 Aircraft Nut (#102).

B.) Draw the Cable underneath the Pulley to the open bracket on the Right Base Frame (#31). Attach a Pulley to the bracket and secure it with one M10 x 1 ¾” Allen Bolt (#93), two Ø ¾” Washes (#100), and one M10 Aircraft Nut (#102).

C.) Draw the Cable underneath the Pulley through the bottom opening on the Right Vertical Frame (#4) to another open bracket on the Right Base Frame. Repeat Procedure B above to install a Pulley.

D.) Draw the Cable around the Pulley then upward to the Double Floating Pulley Bracket (#22) previously installed in Step-10. Install a Pulley to the Brackets on selected hole. After completing Step-12, come back to this step and check the tension of the Cable loop system. If the cables are too loose, move up the Pulley on the Bracket. Move down the Pulley if the Cables are too tight.

E.) Draw the Cable around the Pulley then downward. Install a Pulley to an Angled Double Floating Pulley Bracket (#27).

F.) Draw the Cable around the Pulley then upward to the bracket on the back of Right Vertical Frame. Secure the Cable to the bracket with one M10 x 1” Allen Bolt (#94), two

ؾ” Washers (#100), and one M10 Aircraft Nut (#102). Let the Bracket hanging for now.

G.)Connect the Shiver Bar (#19) to the Cable with a Chain (#75) and two Hooks (#76). Replace Shiver Bar with Single Handle (#83) or Ankle Strap (#84) for various exercises.

21

Page 22
Image 22
Impex MP-4500 manual See Diagram 11 & Lower Cable Loop Diagram