STEP 7 (See Diagram 7 & Cable Loop Diagram)
A.) Attach the 241” High/Low Cable (#31) to the Sliding Pulley Bracket (#17). Attach two Small Pulleys (#59) to the Sliding Pulley Bracket. Secure each Small Pulley with one M10 X 1 ¾” Allen Bolt (#94), two ∅ ¾” Washers (#80), and one M10 Aircraft Nut (#82).
B.) Draw the Cable in between the two Pulleys then upward to the opening on top of the Front Vertical Frame (#9).
C.) Attach a Pulley to the opening. Secure it with one M10 x 2 ½” Allen Bolt (#93), two Ø 1” x 5/8” Pulley Bushings (#77), and one M10 Aircraft Nut (#82).
D.) Draw the Cable around the Pulley then downward to the open bracket on the back of the Front Vertical Frame. Attach a Pulley to the opening on the bracket. Secure it with one M10 x 2 ¾” Allen Bolt (#92), two ∅ ¾” Washers (#80), and one M10 Aircraft Nut (#82). Do not tighten the Nut and Bolt yet. Push the Pulley to the left.
E.) Draw the Cable around the Pulley then upward to the Double Floating Pulley Bracket (#18) previously installed in
F.) Draw the Cable around the Pulley then downward back to the bracket on the back of Front Vertical Frame. Remove the bolt, washers, and nut on the Pulley installed in Procedure D. Attach a Pulley to the right open space on the bracket. Secure the two Pulleys together with the same bolt, washers, and nut.
G.)Draw the Cable around the Pulley upward and clip the end of the Cable onto the hook on the back of the Sliding Pulley Bracket (#17).
H.) Attach the 61” Lower Cable (#30) to the lower opening on the Front Vertical Frame (#9). Attach a Pulley and two Ø 1” x 5/8” Pulley Bushings (#77) to the opening. Align the Foot Plate (#21) to the opening and secure them all together with one M10 x 3 1/8” Allen Bolt (#91) and M10 Aircraft Nut (#82).
I.) Draw the Cable underneath the Pulley to the open bracket on the Rear Vertical Frame (#6). Install a Pulley to the bracket.
J.) Draw the Cable around the Pulley then upward to the Single Floating Pulley Bracket (#19) previously installed in
K.) Connect the Cable to a Short Chain with a Hook (#54). Attach the Short Chain to the Single Floating Pulley Bracket with one M10 x 1 1/8” Allen Bolt (#96), two ∅ ¾” Washers (#80), and one M10 Aircraft Nut (#82).
L.) Adjust the length of the Short Chain to adjust the tension of the Cable system.
M.)Secure the Foot Plate (#21) to the Rear Base (#16) with two M10 x 5/8” Allen Bolts (#98), four
∅¾” Washers (#80), and two M10 Aircraft Nuts (#82).
N.) Connect the Shiver Bar (#23) to the ball stopper on the Lower Cable with one Long Chain (#55) and two Hooks (#54).
17