Impex PREMIER manual See Diagram 8 & Cable Loop Diagram

Models: PREMIER

1 19
Download 19 pages 53.68 Kb
Page 13
Image 13

STEP 8 (See Diagram 8 & Cable Loop Diagram)

A.)

Attach the 161” Lower Cable (#27) to the opening on the bottom of the Leg

 

Developer (#11).

B.)

Attach a Pulley (#64) to the opening. Secure it with one M10 x 2 ½” Allen Bolt

 

(#68), two 7/8” Pulley Bushings (#44), and one M10 Aircraft Nut (#84).

C.)

Draw the Cable underneath the Pulley towards the back of the machine to the

 

opening on the bottom of the Main Base Frame (#1). Install a Pulley as

 

described in Step B above.

D.)

Draw the Cable underneath the Pulley. Insert the Cable through the rectangular

 

tube and the hole on the bottom of the Vertical Beam to the second open bracket

 

under the Main Base Frame.

E.)

Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#69),

 

two ¾” Washers (#81), and one M10 Aircraft Nut (#84).

F.)

Pull the Cable upward to the Double Floating Pulley Brackets (#20) previously

 

installed in Step 6. Install another Pulley. Use any hole on the Bracket for now.

 

After completing the Cable installation, come back to this Pulley and adjust the

 

position. If the Cable loop is too loose, move the Pulley up on the Bracket. If the

 

Cable loop is too tight, move the Pulley down on the Bracket.

G.)

Draw the Cable around the Pulley then downward. Attach the Cable to another

 

Single Floating Pulley Bracket (#22). Install another Pulley. Let the Bracket

 

hanging for now.

H.)

Pull the Cable around the Pulley then upward to the Single Floating Pulley

 

Bracket (#22) previously in Step 7. Secure the end of the Cable to the Bracket

 

with one M10 x 1 1/8” Allen Bolt (#71), two ¾” Washers (#81), and one M10

 

Aircraft Nut (#84).

12

Page 13
Image 13
Impex PREMIER manual See Diagram 8 & Cable Loop Diagram