Assembly

Figure 4

Locate bag labeled Figure 4. Lift and place left linkage onto shaft sleeve and align holes. Secure linkage to unit using four M8*12 mm hex bolts. Repeat for right side.

Note: The linkage is secured to the sleeve with three M8*12 hex bolts on the top of the linkage and one M8*12 hex bolt on the bottom of the linkage.

Figure 5

Locate bag labeled Figure 5. Locate right pedal tube assembly. Secure pedal tube assembly to the handrail assembly with one M10*81.5 hex bolt and one M10*1.5 hex nut. Please ensure that pedal arm is aligned in the center of roller wheel while tightening M10*81.5 bolt (Figure 5a). Repeat for the left side.

Note: It is recommended that 2 adults align and secure the pedal tube assemblies to the handrail assemblies.

Figure 5a

Figure 4

SLEEVE

LINKAGE

M8*12 HEX BOLT

Figure 5

HANDRAIL ASSEMBLY

 

PEDAL TUBE ASSEMBLY

 

 

M10*1.5 HEX NUT

M10*81.5 HEX BOLT

 

Page 7
Image 7
Ironman Fitness Adventure owner manual Sleeve