Jacuzzi F258000 Outsid E, Drilling Top Ring, Illustration, Important S Must Drill At A, Bolt W

Models: F258000

1 24
Download 24 pages 50.42 Kb
Page 18
Image 18
DRILLING TOP RING

DRILLING TOP RING

OUTSID

E

15° OUTSID

IMPORTANT:

MUST DRILL AT A 15°

1/8" ANGLE TO AVOID ILLUSTRATION 20DRILLING THROUGH ROLLER TRACK OF TOP RING.

14.Drill a 3/32" diameter hole into the top ring at a 15° angle. (See Illustration 20.) Engage the top of the fixed panel with the top ring groove. Secure the top of the fixed panel to the top ring. (See Illustration 21.)

ILLUSTRATION 20

DRILLING TOP RING

ROLLER FIXED

TRACK PANEL

TOP RING

GROOVE

15° IMPORTANT: S MUST DRILL AT A 15°

IMPORTANT:RING TO BRACKET S MUST DRILL AT A 15°BOLT W

ANGLE TO AVOID DRILLING THROUGH ROLLER TRACK.

ILLUSTRATION 21

RING TO BRACKET

PAINT OUTSIDE EDGE TO

MATCH BATHROOM FINISH

BOLT W

QTY.-2

ILLUSTRATION 22A

S SCREW

M3.5X9.5MM

STAINLESS STEEL

QTY.-1

 

15.Plumb and square the tower. (See Illustrations 22A and 22B.) Secure the top ring to the wall bracket by inserting the hex bolts through the wall bracket into the top ring and tighten (wall bracket is pre-threaded).

LOCATED IN HARDWARE PACK

W BOLT

SCREW, HEX

QTY.-2

WASHER BOLT

1/4-20X2.5"

 

RING TO BRACKET

ILLUSTRATION 22B

16

Page 18
Image 18
Jacuzzi F258000 Outsid E, Drilling Top Ring, Illustration, Important S Must Drill At A, Ring To Bracket, Bolt W, S Screw