Jacuzzi J-DREAM II Turn On Electric Power at Main Breaker, Operate Unit and Check for Leaks

Models: J-DREAM II

1 36
Download 36 pages 2.52 Kb
Page 28
Image 28
Turn On Electric Power at Main Breaker

J-Dream II Owner's Manual

Turn On Electric Power at Main Breaker

Operate Unit and Check for Leaks

Attach Bottom Front Panel to Unit

Take the bottom panel at an angle and insert under the bottom of the enclosure frame. Rotate backwards till it is up against the brackets with the pre-installed Velcro®.

Enclosure

Base

Frame

Panel

Use finishing strip material (not provided) to cover gap

between J-Dream II and finshed wall. Do not attach finishing strips to face panels.

Screws

Velcro®

Velcro®

Removable Face Panels

Bottom Face Panel fastened with Velcro®

26

Page 28
Image 28
Jacuzzi J-DREAM II owner manual Turn On Electric Power at Main Breaker, Operate Unit and Check for Leaks