Contents
Part I Assembly & Installation
Specifications _______________________________________________________________________ | 2 |
General Information __________________________________________________________________ | |
Packaging __________________________________________________________________________ | 5 |
Hardware Identification ________________________________________________________________ | 6 |
7 | |
Base and Drain ______________________________________________________________________ | |
Installation of Panels __________________________________________________________________ | |
Door Frame _________________________________________________________________________ | 17 |
Top Frame __________________________________________________________________________ | 18 |
Hose and Electrical Connections ________________________________________________________ | |
Bonding ____________________________________________________________________________ | 22 |
Final Plumbing ______________________________________________________________________ | 23 |
Front Panels ________________________________________________________________________ | 24 |
Cover ______________________________________________________________________________ | 25 |
Completing the Installation _____________________________________________________________ | 26 |
Part II Operation and Maintenance _______________________________ | |
Warranty _____________________________________________________________ |
Inspection and Shipping Claim
Check for shipping damage upon receipt of the
Once the
NOTE: Damage or defects which could have been discovered and repaired prior to installation and which are claimed after final installation of the
1