Jacuzzi K339000X manual Allusion, Front, Pump Motor, Blower Service Access Required

Models: K339000X

1 30
Download 30 pages 51.38 Kb
Page 27
Image 27
Allusion

The following details will replace information found in the Combination Air Bath and Whirlpool Installation and Operation Instructions, BR28000B (4/05) manual.

CAUTION: Install all electrical services on the right side of the bath. The blower has been moved from the left side to the right side, next to the pump motor.

NOTE: The following art replaces the similar art found on

Page 1 of the Combination Air Bath and Whirlpool manual.

L

4"

2"H

Heater

Blower Motor

SIDE VIEW

Allusion

W

END VIEW

NOTE: The following art replaces both pieces of similar art at the bottom of Page 3 of the manual. The art "Blower Service Access" shows the blower on the left end of the bath, but it has been moved to the right end, alongside the pump motor.

FRONT

 

Blower

Heater

12"

 

 

Motor

18" MOTOR SERVICE

18"AREA HEATER SERVICE AREA

Pump Motor, Blower Service Access (Required)

Jacuzzi™ Addendum, Control Panel Electrical Requirements

Page of 2

Publication GR86000A • 08-08

Page 27
Image 27
Jacuzzi K339000X manual Allusion, Front, Pump Motor, Blower Service Access Required