INSTALLING THE AVA7
Installation of the AVA7 is a straight- forward process.
IMPORTANT:
The amplifier must be installed following the directions described below. To ensure adequate perform- ance and safety, never install the amplifier with less free space around the amplifier than what is specified.
Always put amplifiers on the bottom of a stack.
Heavy equipment should not be sup- ported solely by the
1.The JBL Performance Series AVA7 power amplifier has been designed to be mounted in EIA standard racks, or stacked freestanding as long as there is 4 inches (10cm) of free space around the amplifier (sides and rear). If the AVA7 is being mounted in a rack, it is suggested that its feet be removed prior to installation. If the AVA7 will be stacked with other components, use the feet that came attached to the unit. This will ensure that there is suf- ficient air space underneath so that heat can be dissipated effectively. Two rack ears are included with the AVA7. To install these rack ears, remove the four machine screws on each of the two side panels (see drawing), hold each rack ear in place, and attach it to the AVA7 using the same four screws. Make sure that these screws are securely tightened.
2.Make sure that the amplifiers are located in a
3.Using a helper to guide the unit into the rack, gently slide the AVA7 into place. Align the rack mounting holes to the rack ears of the equipment rack.
4.Starting with the bottom two screw holes and using two of the rack screws and plastic washers (if sup- plied with your rack), secure the AVA7 into the rack. It may be neces- sary to have a helper hold up the rear of the unit until you have started the threads of the screws. Once the
Side view of amplifier without rack ear.
Side view of amplifier with rack ear attached.
Front view of amplifier with rack ear attached.
bottom mounting screws are installed, move to the top mounting screws. Once done, check and tighten all four screws. Always use all four screws when mounting any equipment.
9