This chapter covers all operations of the blowers for FORTRA
FFoorrccee44
G15 and
G15+ units. Refer to Chapter 1 for blower specifications. The blowers are hot
swappable and can be removed or installed while the enclosure continues to
function, however, failure to replace a non-working blower within a reasonable
period of time may expose drives to extreme heat, which could cause loss of data.
The blowers are located on the back of the
unit and each has its own fault LED that will
light if the blower is non-operational.
Blower Removal/Insertion
The blower is designed to be easily installed and removed.
1. Unfasten the blower thumbscrew by
turning counterclockwise. A Philips
head screwdriver can be used if the
thumbscrew is too tight to turn by hand.
2. Remove the blower sled by pulling out
on the handle and grasping the side of
the blower tray. Wait for the blower to
stop completely before removing it
from the unit.
Reverse the steps to reinstall the blower.
FORTRAFORCE4G15 & G15+ RAID System Installation Guide Rev A 5-1
Fault LED
WARNING: To prevent injury when removing or installing the blower, do not
grab the bottom of the tray which is used for blower access intake. The
blower operates at high speeds and continues to spin for a short time
after power is disconnected.
WARNUNG: Um Verletzungen während der Entfernung oder Installation des
Gebläses zu vermeiden, berühren Sie nicht dessen Unterseite, da hier
der Lufteintritt erfolgt. Das Gebläse arbeitet mit hohen
Geschwindigkeiten und läuft nach Abschalten der Versorgungsspannung
noch einige Zeit nach.
WARNING: Blowers are a system critical component. Non-operating blowers
should be replaced as soon as possible to avoid data loss or device failure.
WARNUNG: Gebläse sind für die Funktion wichtige Komponenten. Nicht
funktionierende Gebläse sollten so schnell wie möglich ersetzt werden,
um Datenverluste oder Fehlfunktionen zu vermeiden.
5. Blower Operation