Kobe Range Hoods CH2230SQ, CH2236SQ Puncture the knockout holes on the hood as shown in Figure

Models: CH2230SQ CH2236SQ

1 31
Download 31 pages 47.94 Kb
Page 11
Image 11
Manual background

1.Puncture the knockout holes on the hood as shown in Figure 10.

2.Unscrew and remove the multi duct exhaust. Replace with {D} vent cover (top) on page 3. Refer to Figure 11.

Figure 10

Figure 11

3.Unscrew the six screws on the bottom casing. Remove the bottom casing. If necessary, arrange the electrical wires to run through the 1” diameter hole on the top or the rear of the hood. Refer to Figure 12.

4.Using references on Table 1 and measurements on page 21 center the hood in place beneath the cabinet and flush with the front of the cabinet.

5.Place screw (not provided) into the exact center of each knockout hole. Make sure all screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS SECURE BEFORE RELEASING.

Manual background 1” Diameter Hole

Figure 12

Ductwork Installation

6.Use aluminum or steel pipe to connect the exhaust opening at the rear of the hood to the ductwork. Use duct tape to make all joints secure and air tight.

7.Continued on page 16.

9

Page 11
Image 11
Kobe Range Hoods CH2230SQ Puncture the knockout holes on the hood as shown in Figure, 1” Diameter Hole, Continued on page