Kobe Range Hoods CH2230SQ 1” Diameter Hole, Draw electrical wires through cabinet access opening

Models: CH2230SQ CH2236SQ

1 31
Download 31 pages 47.94 Kb
Page 9
Image 9
1” Diameter

2.Unscrew the six screws on the bottom casing. Remove the bottom casing If necessary, arrange the electrical wires to run through the 1” diameter hole on the top or the rear of the hood. Refer to Figure 5.

3.Using references on Table 1 and measurements on page 21 center the hood in place beneath the cabinet and flush with the front of the cabinet.

1” Diameter

Hole

Figure 4

Figure 5

4.Draw electrical wires through cabinet access opening.

5.Place screw (not provided) into the exact center of each knockout hole. Make sure all screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS SECURE BEFORE RELEASING.

Ductwork Installation

6.Use aluminum or steel pipe to connect the plastic exhaust on the hood to the ductwork above. Use duct tape to make all joints secure and air tight.

7.Continued on page 16.

7

Page 9
Image 9
Kobe Range Hoods CH2230SQ 1” Diameter Hole, Draw electrical wires through cabinet access opening, Ductwork Installation