Kobe Range Hoods CH7942SQB, CH7936SQB, CH7948SQB, CH7930SQB Wall Mount Installation – Top Vent

Models: CH7930SQB CH7948SQB CH7942SQB CH7936SQB

1 102
Download 102 pages 8.34 Kb
Page 13
Image 13
WALL MOUNT INSTALLATION – TOP VENT

WALL MOUNT INSTALLATION – TOP VENT

***This installation only applied with the purchase of a duct cover.

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING.

-Decide the location of the venting pipe from the hood to the outside. Refer to Figure 13.

-A straight, short venting run will allow the hood to perform more efficiently.

-Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance of the hood.

-Use duct tape to seal the joints between pipe sections.

-If necessary, prepare back wall frame with cross framing lumber for secure installation.

-Using references on Table 2 and measurements on Page 22-23, decide the level of the lumber. Refer to Figure 14.

Hood Preparation before Installation

-Temporarily wire the hood to test for proper operation before installing.

-Peel protective film off the hood and the duct cover (if any).

-Cut the multi vent exhaust according to the size of the venting pipe. Refer to Figure 15.

Figure 13

Figure 14

6" Round Vent

7" Round Vent

3-1/4" x 10" Vent

Figure 15

11

Page 13
Image 13
Kobe Range Hoods CH7942SQB, CH7936SQB, CH7948SQB, CH7930SQB installation instructions Wall Mount Installation – Top Vent