Leica 798056, 772789-R, 6007282, 6007285 Adjusting vertical accuracy The Z-axis, Check your work

Models: 772789-R 6007285 762767-R 6007282 798056

1 31
Download 31 pages 4.48 Kb
Page 16
Image 16

EN

remote for this adjustment will make the job easier by not disturbing the laser.

After completing the changes to the Y-axis, do one of the following steps:

XPress the Minus key {B-8}to exit adjustment mode, save changes and turn off the laser.

XPress the On/Off key {B-3}at any time to turn off the laser without saving any changes.

Use of the remote for this adjustment will make the job easier by not disturbing the laser.

After completing the changes to the Z-axis, do one of the following steps:

XPress the Minus key {B-8}to exit adjustment mode, save changes and turn off the laser.

XPress the On/Off key {B-3}at any time to turn off the laser without saving any changes.

Adjusting vertical accuracy – The Z-axis

After checking the vertical accuracy of your laser, perform the following steps to adjust the Z-axis.

XTurn off the laser.

XPlace the laser in the laydown position approximately 6 meters (20 feet) from a plumb line on a wall.

XPress and hold the Auto/Manual key {B-1}, then press the On/Off key {B-3}.

XAfter the X and Y LED’s blink three times simultane- ously, release the Auto/Manual key.

The Z-axis (Y-axis) LED will flash rapidly (red) while leveling.

The Z-axis (Y-axis) LED will flash slowly (red) when ready for adjustment.

The head will not be rotating.

To use a receiver, press the Scan/Rotation key {B-2}to start rotation mode.

XPress a CCW/CW key {B-6 or B-7, hidden on Roteo 20HV} to adjust the beam to the plumb line. Twenty-five presses of the key will move the beam approximately 1.5 mm at 6 meters (1/16" at 20 feet).

Check your work

After any accuracy adjustments always double check your work, by making a final check of the laser.

Check and Adjust

13

Roteo 20HV/25H/35/35G - 1.2.0en

Page 16
Image 16
Leica 798056, 772789-R, 6007282, 6007285, 762767-R user manual Adjusting vertical accuracy The Z-axis, Check your work