LG Electronics LCN240CP service manual Pumping down, Procedure, Air purging of the charge hose

Models: LCN240CP

1 61
Download 61 pages 31.01 Kb
Page 49
Image 49

(3-way) Valve

(1) Pumping down

Indoor unit

Liquid side

 

Open

Outdoor unit

3-Way valve

Gas side

Closed

3-Way valve

Lo

CLOSECLOSE

Purge the air

Procedure

For pumping down,firstly short the Low Pressure s/w at the outside and then operate below proce- dure.

1.Confirm that both the gas side and liquid side valves are set to the open position.

-Remove the valve stem caps and confirm that the valve stems are in the raised position.

-Be sure to use a hexagonal wrench to operate the valve stems.

2.Operate the unit for 10 to 15 minutes.

3.Stop operation and wait for 3 minutes, then con- nect the manifold gauge to the service port of the gas side valve.

-Connect the hose of the gauge with the push pin to the service port.

4.Air purging of the charge hose.

-Open the Low-handle valve on the gauge slightly to air purge from the hose.

5.Set the liquid side valve to the closed position.

6.Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 1kg/cm2g.

7.Immediately set the gas side valve to the closed position.

-Do this quickly so that the gauge ends up indi- cating 1kg/g.

8.Disconnect the charge set, and mount the liquid side and gas side valve caps and the service port nut.

-Use torque wrench to tighten the service port nut to a torque of 1.8kg.m.(4.2kg.m/5.5kg.m)

-Be sure to check for gas leakage.

Be sure to short pressure S/W. otherwise Low pressure S/W detect low pressure skete and stops the compressor.

Service Manual 49

Page 49
Image 49
LG Electronics LCN240CP service manual Pumping down, Procedure, Air purging of the charge hose