Installation

Built-In Compactors

Procedure C (continued)

• Lay drawer front face down on a flat surface.

Remove 9 screws which retain the front panel and handle.

Save handle and galvanized inner door.

Discard front panel with side trim.

Place galvanized inner door onto the back side of the finished panel.

• Position the inner door 1/4" below the top of the finished panel and center, left to right.

Use the inner door as a template. Drill 3 pilot holes in the top edge and 2 at the bottom, sized to match screws being used. (Screws are not provided)

Caution: Select screw length carefully to avoid penetration of the finished side.

Lift the top edge of the inner door and slide the

handle between the inner door and the finished panel. Align the screw holes of the inner door and handle with pilot holes.

Drive 2 screws loosely in the top. Align bottom holes, and check to be sure that the inner door is centered left to right over the finished panel. Drive 2 screws at bottom.

Drive last screw at top, tighten all screws.

• Replace drawer front to drawer by re-installing the hinge pins. Swing door against drawer and secure with side clasp.

Slowly push the drawer closed and check alignment

of the panel.

13

Page 13
Image 13
GE Monogram ZCG3100, ZCG3500, ZCG3300 installation instructions Procedure C