Step 1 Determine toekick depth
Step 2 Adjust movable base
Installation
Built-In Compactors
Place a section of the carton on the floor for protection. Lay the compactor on its back, supporting it with a piece of wood to prevent pressure on the power cord.
Measure the toekick of an adjacent cabinet, from the front of the cabinet door to the front of the toekick (Dimension A).
Note: If a custom toekick board is used, its thickness must be accounted for in dimension “A”. See step 6.
With the compactor laying on its back, locate the six Phillips head screws on the bottom, positioned inside of the movable base.
Loosen these six screws. Slide base to set dimensions “A” as shown.
Tighten screws making sure base does not move.
Note: If an alternate toekick depth dimension is required, follow the procedure above and adjust the base accordingly. The base can be adjusted from
8