Electrical Installation

Top Cable Entry

When making the power connections, the recommended order of pulling and installing cables is to start from the top connections to the bottom connections. The cables must be routed around the fault braces (see Detail in Figure 3). This is to prevent the cables from contacting other busbars. The recommended conduit layout is shown in Figure 1.

Bottom Cable Entry

When making the power connections, the recommended order of pulling and installing cables is to start from the bottom connections to the top connections. The cables must be routed around the fault braces (see Detail in Figure 3. This is to prevent the cables from contacting other busbars. The recommended conduit layout is shown in Figure 1.

NOTE

For a Single Input configuration, linking busbars must be installed between the bypass and the rectifier input.

! WARNING

Risk of electrical shock. Can cause injury or death.

If the load equipment will not be ready to accept power on the arrival of the commissioning engineer, ensure that the system output cables are safely isolated at their termination.

! WARNING

Risk of electrical shock. Can cause injury or death.

When connecting the cables between the battery extremities to the circuit breaker always connect the circuit breaker end of the cable first.

NOTE

If fault bracing brackets were removed during installation, they MUST be replaced.

5. Close and secure the interior and exterior doors.

Table 1

 

Current ratings—rectifier input

 

 

 

 

 

 

 

 

 

 

 

 

 

UPS Rating

 

Voltage, VAC

 

 

External

External

 

 

 

 

 

 

 

 

Nominal

Maximum

100% Breaker

80% Breaker

 

 

 

 

 

 

 

 

kVA

 

kW

 

Input

 

Bypass

Output

Current

Current

Trip, Amps

Trip, Amps

 

 

 

 

 

 

 

 

 

 

 

 

250

 

225

 

480

 

480

480

313

392

400

500

 

 

 

 

 

 

 

 

 

 

 

 

300

 

270

 

480

 

480

480

376

469

500

600

 

 

 

 

 

 

 

 

 

 

 

 

400

 

360

 

480

 

480

480

500

625

700

800

 

 

 

 

 

 

 

 

 

 

 

 

Table 2

Current ratings—bypass input

 

 

 

 

 

 

 

 

 

 

 

 

UPS Rating

 

Voltage, VAC

 

Nominal

10 Minute

External Breaker

 

 

 

 

 

 

kVA

kW

Input

Bypass

 

Output

Current

Overload

Trip, Amps

 

 

 

 

 

 

 

 

 

250

225

480

480

 

480

301

376

400

 

 

 

 

 

 

 

 

 

300

270

480

480

 

480

361

451

500

 

 

 

 

 

 

 

 

 

400

360

480

480

 

480

481

601

700

 

 

 

 

 

 

 

 

 

Table 3

Current ratings—output

 

 

 

 

 

 

 

 

 

 

 

 

 

UPS Rating

 

Voltage, VAC

 

Nominal

10 Minute

External Breaker

 

 

 

 

 

 

kVA

kW

Input

Bypass

 

Output

Current

Overload

Trip, Amps

 

 

 

 

 

 

 

 

 

250

225

480

480

 

480

301

376

400

 

 

 

 

 

 

 

 

 

300

270

480

480

 

480

361

451

500

 

 

 

 

 

 

 

 

 

400

360

480

480

 

480

481

601

700

 

 

 

 

 

 

 

 

 

6

Page 10
Image 10
Liebert NXL installation manual Current ratings-rectifier input, Current ratings-bypass input, Current ratings-output